Get in Touch Our Work

The Erie Party Barn going up, filmed by Rosie Photo Video over the course of the raising. One minute, twenty-eight seconds.

In the shop

It starts on the floor, weeks before.

Every piece is cut, checked, and prepped in our Sylvania, Pennsylvania, joinery shop. The complicated assemblies are put together once here, on the floor, so the first time they go together on site is really the second.

The first bent

The first one tells you how the week will go.

It goes up however the site allows: with a crane where there’s room for one, a telehandler and a long jib where there isn’t, and now and then a chain hoist and a few of us pulling on it.

The pick

The wind finds us on crane day.

Most raisings run into weather at some point. We plan for it and adjust when it changes, so the crew stays safe, the quality holds, and the schedule keeps moving.

Sometimes that means waiting out the wind before setting trusses. Other times it means lifting an entire roof system with one crane and landing it on all sixteen of its connections as the wind comes up.

When the weather turns the site to mud, we bring three pairs of boots: one for the deck, one for loading timber, and one for climbing, so no mud ends up on the frame.

On the ridge

The last joints are the highest ones.

Valley rafters, purlins, the last pegs at the peak. By now the frame is carrying itself, and what’s left is the work you can only do from the top.

Topping out

A pine bough at the peak, and the crew comes down.

When the last timber is set, a bough goes up at the ridge. It’s an old tradition, and we keep it. Then there’s a feeling on site that’s hard to describe to someone who hasn’t been there, and sometimes a party under something that didn’t exist a few days ago.

Want to see one go up?

We’re in Sylvania, Pennsylvania. Come by the shop, or ask us when the next raising is.

Get in Touch